YOUR LOGO
HERE
Example Homes Ltd
Your phone number · your email · your website
- Project
- Plot 14, Example Meadows (fictional development)
- Location
- Exampletown, England, United Kingdom
- Date generated
- 14 October 2026, 17:05
- Recorded observations
- 6
Photos3
Snags6
Closed3
Still open3
Kitchen
1
2
Kitchen: worktop and base units. A real report shows your own photo with each observation numbered where you tapped.
Observation 1Medium · Closed
- Assigned to
- Dan Price
- Due date
- 9 October 2026
- Observation transcript
- The joint between the sink-run and hob-run worktops is open by about 1 mm and has not been sealed.
- Response / action recorded
- Joint re-made and sealed on 8 October.
Observation 2Low · Closed
- Assigned to
- Dan Price
- Due date
- 10 October 2026
- Observation transcript
- The cabinet door to the left of the oven is misaligned and catches the next door when opened.
- Response / action recorded
- Hinges adjusted on 8 October. The doors now line up and close without touching.
Family bathroom
3
4
Family bathroom: bath and basin wall.
Observation 3High · Closed
- Assigned to
- Lee Morgan
- Due date
- 8 October 2026
- Observation transcript
- The silicone seal along the bath edge stops short at the tap end, leaving a gap to the tiling where water can get in.
- Response / action recorded
- Old silicone removed and the bath resealed along its full length on 7 October.
Observation 4Medium · In progress
- Assigned to
- Lee Morgan
- Due date
- 17 October 2026
- Observation transcript
- Two wall tiles above the basin are chipped at the corners.
- Response / action recorded
- Matching tiles ordered. Replacement and regrouting booked for 16 October.
Bedroom 2
5
6
Bedroom 2: window and reveals.
Observation 5Low · Ready for review
- Assigned to
- Sam Okafor
- Due date
- 15 October 2026
- Observation transcript
- The paint finish to the left-hand window reveal is patchy, with filler showing through.
- Response / action recorded
- Reveal filled, sanded and repainted on 13 October. Ready for checking.
Observation 6High · In progress
- Assigned to
- Chris Hall
- Due date
- 16 October 2026
- Observation transcript
- The window does not lock fully; the handle has to be forced into the locked position.
- Response / action recorded
- Window supplier booked to adjust the mechanism on 15 October. The other windows on this elevation were checked and lock correctly.
Each snag was described aloud on site, transcribed by Okuyi and checked by the inspector, then assigned to the person responsible with a due date. This copy of the report was generated eight days after the inspection, so it shows what has been fixed and what is still open.
This is a fictional example to show the style and structure of a report made with Okuyi. The company, property and people are invented. Okuyi does not replace the inspector's professional judgement.